Contact us

Water shut-off agent

AquaGuard™

Plug water flow paths. Restore oil production

From the AquaGuard product sheet

Before treatment: water flows through an open, connected pore network. After treatment: mineral precipitate fills and isolates the pores.

Performance

99%

Plugging efficiency

Up to 99% plugging efficiency, for long-term, permanent water shut-off.

No

Gelation risk in the tubing

Uninterrupted injection, easy cleanup

Why it matters

Water finds the easiest path. AquaGuard closes it.

The challenge

Connected, high-permeability pore networks let water bypass the oil and flood the well. Every extra barrel of water must be lifted, separated, treated and disposed of, while oil output falls.

The AquaGuard solution

Injected with water-like viscosity, AquaGuard reaches deep into the reservoir and precipitates inside pore spaces, blocking connected flow pathways. Its extremely low solubility gives a long-lasting, permanent shut-off.

Advantages of AquaGuard

AquaGuard™ at a glance

  • Selectivity

    A hydrophilic nature promotes placement in water-bearing zones.

  • Water-like viscosity

    Easy injection and deep invasion into the reservoir.

  • Stable under reservoir conditions

    Precipitates hold under high temperature, pressure and varied pH.

  • No gelation risk in the tubing

    No gel or viscous solutions: uninterrupted injection, easy cleanup.

  • Environmentally friendly

    Friendly to the environment and easy to handle.

  • Reversible

    If the oil zone is plugged, it can be reversed by chemical treatment.

Next step

Discuss a candidate well

SDS and TDS available on request.

Email
Info@WellguardSolutions.com
Web
wellguardsolutions.com